Wednesday, June 10, 2009

Glass, Carpet and Other Shiny Things

The glass co enclosed the shower on the main floor (aka the decon shower), as well as installing the door to the master shower. The carpet layers got all the bedrooms with the exception of the master finished. The electricians did some work installing lights and outlets downstairs. The plumbers decided they needed to dial down the pressure in our system and so ripped out some wall to expose the mainline. It may be to our advantage to have this done outside, but we'll have to find out from the city if this is possible. Meanwhile, the hot water heaters and softener were installed. The main hardwood floors were uncovered, and our hardwood installer was getting the stair caps all figured out this evening.

No comments: