Tuesday, June 2, 2009

Fixtures Galore

Much good work today. Dad/Grandpa H. and the hardwood floor installer got the cap and trim work done for the stairs so that the spindles can be installed. The electrician got many of the light fixtures and can lights in and switches placed. Our plumbers installed sink faucets, toilet drains and found the cold air return. Our low-voltage installer got to work on the speaker system. The cement guys were mostly rained out but did place some more guides in the backyard. We're told that the cabinet makers stopped by, but no word yet on the install. Also noted the progress with taping off trim in the basement by the painters.

1 comment:

Unknown said...

i LIKE the paint (yes, i know, this was a FIXTURES post)! much has changed since i was home!