Mr. Blandings Builds His Dream House

Jeff and Stephanie's saga to not recreate the movie in real life!

Wednesday, March 11, 2009

Wood floor and shelves - marble stalls

Our floor installer was at work again, finishing off the flooring around the breakfast area. The shelving was finished in the cold storage room, making it much less spacious (goodbye batcave). The cultured marble installer was back at work getting the floors in the shower stalls, and hopefully some of the walls in place as well.
Posted by Jeff at 9:20 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ►  2010 (2)
    • ►  April (1)
    • ►  February (1)
  • ▼  2009 (136)
    • ►  October (1)
    • ►  September (1)
    • ►  June (19)
    • ►  May (27)
    • ►  April (23)
    • ▼  March (24)
      • Downstairs Tiling
      • Stair Edges and Tile
      • Vanity Cabinets (Laundry too)
      • One Coat Down
      • Cabinet Doors and Unstained Floors
      • Socks Only
      • Footers, Grout, and Flooring
      • Shiny Floors
      • Staining Floors
      • Windowed Door, Covered Floor
      • Sanding and Cutting
      • Hearth and Home
      • More Floor
      • Acrylic & Wood floors, Stall Walls
      • Floors, Doors and Floors
      • Wood floor and shelves - marble stalls
      • Wood & Cement Floors, Cold Shelves
      • Finishing the Finish Work
      • Dry Storage and Handlesets
      • Downstairs Cased and Shelved
      • Abbreviated Tile
      • Medallions and Downstairs Doors
      • Lots of Neat Stuff
      • Coffered Ceilings
    • ►  February (19)
    • ►  January (22)
  • ►  2008 (83)
    • ►  December (15)
    • ►  November (20)
    • ►  October (21)
    • ►  September (11)
    • ►  August (10)
    • ►  July (6)

Other blogs

  • Hancock Haven

About Me

My photo
Jeff
View my complete profile

Ethereal theme. Powered by Blogger.