Mr. Blandings Builds His Dream House

Jeff and Stephanie's saga to not recreate the movie in real life!

Thursday, March 26, 2009

One Coat Down

The accent tile was placed, and the majority of the main floor tiled (the bathroom excepted). The wood floor was stained last night, and the first coat of finish applied this morning - the second coat to be delivered this evening. Nice and shiny.
Posted by Jeff at 5:18 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ►  2010 (2)
    • ►  April (1)
    • ►  February (1)
  • ▼  2009 (136)
    • ►  October (1)
    • ►  September (1)
    • ►  June (19)
    • ►  May (27)
    • ►  April (23)
    • ▼  March (24)
      • Downstairs Tiling
      • Stair Edges and Tile
      • Vanity Cabinets (Laundry too)
      • One Coat Down
      • Cabinet Doors and Unstained Floors
      • Socks Only
      • Footers, Grout, and Flooring
      • Shiny Floors
      • Staining Floors
      • Windowed Door, Covered Floor
      • Sanding and Cutting
      • Hearth and Home
      • More Floor
      • Acrylic & Wood floors, Stall Walls
      • Floors, Doors and Floors
      • Wood floor and shelves - marble stalls
      • Wood & Cement Floors, Cold Shelves
      • Finishing the Finish Work
      • Dry Storage and Handlesets
      • Downstairs Cased and Shelved
      • Abbreviated Tile
      • Medallions and Downstairs Doors
      • Lots of Neat Stuff
      • Coffered Ceilings
    • ►  February (19)
    • ►  January (22)
  • ►  2008 (83)
    • ►  December (15)
    • ►  November (20)
    • ►  October (21)
    • ►  September (11)
    • ►  August (10)
    • ►  July (6)

Other blogs

  • Hancock Haven

About Me

My photo
Jeff
View my complete profile

Ethereal theme. Powered by Blogger.