Friday, November 21, 2008

Footing prep, Plumbing and a Clean Batcave

As you can see from the photos, the concrete guys put tarps down in preparation for forming and pouring soon. The Housley crews were busy getting the HVAC downstairs fininshed (you can see the furnace in place), and the kinks in the plumbing plan worked out. After some discussion we came to the conclusion that we simply wanted to be able to have more than one shower going at the same time, and not have to worry about someone else flushing the toilet elsewhere. I trust they know what to do to make that work. Beyond that we talked with the specialty roofers about getting the dining room bay covered, and shielded on the bottom as well. Finally Dad/Grandpa Hancock and I knocked the timber supports out of the batcave (cold storage beneath the porch), and the ceiling didn't come crashing down. I look forward to what Batmom (Steph) will be doing with it!