In addition to the primer (first coat) on the ceilings on the main and upper floor, it looks like the trim downstairs got a second coat. Though not done today, we get a better look at the "tamping down" of the pathway into the backyard, and a "macro view" of the front of the house with the gravel pile strategically moved to accommodate concrete pouring tomorrow.
No comments:
Post a Comment