Mr. Blandings Builds His Dream House

Jeff and Stephanie's saga to not recreate the movie in real life!

Saturday, May 30, 2009

Compaction, Pipes & Draping

A good Saturday of progress. Our excavator compacted the pathway and back patio. Our landscaper placed several pipes strategically so that the sprinkler system can be run beneath the concrete. And our painters taped off the walls in preparation for painting the ceilings, as well as putting a finish coat on the trim and doors downstairs. Onward and upward!
Posted by Jeff at 9:10 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ►  2010 (2)
    • ►  April (1)
    • ►  February (1)
  • ▼  2009 (136)
    • ►  October (1)
    • ►  September (1)
    • ►  June (19)
    • ▼  May (27)
      • Upper Ceilings Primed
      • Compaction, Pipes & Draping
      • COLORS!
      • Baby Step Forward
      • 1 Step Back
      • Walls Primed!
      • Moving Along
      • Shiny Coats and Sunsets
      • Priming Downstairs and Fixing Screws
      • Glossy Paint and Dirt
      • Wainscoated
      • Filled In & Painted Over
      • Priming the Crown
      • Return of the Taskmaster
      • Grading and Paint Prep
      • Rocks, Dirt, and Paint
      • Priming on the Main
      • Baby Steps
      • Feet to the Fire
      • Slowing to a Standstill
      • Chipping Away
      • A Little Trim Painted
      • Painting Angst
      • A Bit of Priming
      • Spackling and Staining
      • Vanity Tops Delivered
      • More Prep
    • ►  April (23)
    • ►  March (24)
    • ►  February (19)
    • ►  January (22)
  • ►  2008 (83)
    • ►  December (15)
    • ►  November (20)
    • ►  October (21)
    • ►  September (11)
    • ►  August (10)
    • ►  July (6)

Other blogs

  • Hancock Haven

About Me

My photo
Jeff
View my complete profile

Ethereal theme. Powered by Blogger.