Our floor installer was at work again, finishing off the flooring around the breakfast area. The shelving was finished in the cold storage room, making it much less spacious (goodbye batcave). The cultured marble installer was back at work getting the floors in the shower stalls, and hopefully some of the walls in place as well.
No comments:
Post a Comment